Green Meter Price in Pakistan (2026): Bi-Directional Meter, Demand Notice Fees & Total Installation Cost
⚡ 2026 Green Meter Budgeting at a Glance The total all-inclusive cost to secure an official 3-phase bi-directional...
Sell your surplus daytime solar units back to the national grid through a bidirectional green meter. Learn the eligibility rules, required NOCs, transformer limits, and exact costs across LESCO, IESCO, K-Electric, MEPCO, and FESCO.
Official procedural roadmap approved by NEPRA for converting residential and commercial connections to bi-directional billing.
Net metering is granted exclusively to 3-phase electricity meters. If you currently have a single-phase connection, submit an application to your local DISCO sub-division to upgrade your sanctioned load.
Only installers certified with the Alternative Energy Development Board (AEDB) / PPIB can sign and stamp your engineering design and structural stability documents for DISCO approval.
Prepare Single Line Diagrams (SLD), inverter NEPRA compliance certificates (anti-islanding protection), earthing resistance test reports (< 5 Ohms), and solar panel flash test data.
Engineers from your DISCO inspect the local distribution transformer capacity (NEPRA limits total solar generation to 80% of the transformer's rated capacity).
The consumer and the DISCO sign the 3-year standard bilateral power purchase agreement detailing export credit settlement and billing reconciliation.
Purchase a DISCO-approved bidirectional smart meter (MicroTech or Syed Bhais) and send it to the M&T (Metering & Testing) laboratory for calibration and seal testing.
The DISCO team installs the calibrated green meter, removes the unidirectional meter, and issues your NEPRA Generation License. Bi-directional credits begin immediately on your next bill!
Complete documentation package needed for fast-track processing through your local DISCO sub-division (LESCO, IESCO, K-Electric, MEPCO, FESCO):
Official green meter procurement charges, M&T testing laboratory fees, and average approval duration across Pakistani distribution companies.
| DISCO / Distribution Utility | Green Meter Fee (Approx) | M&T Test Fee | Average Approval Time | Transformer Cap Limit |
|---|---|---|---|---|
| LESCO (Lahore Electric Supply) | Rs. 85,000 – 110,000 | Rs. 15,000 | 4 to 6 Weeks | 80% of Rated kVA |
| IESCO (Islamabad Electric Supply) | Rs. 80,000 – 105,000 | Rs. 12,000 | 3 to 5 Weeks | 80% of Rated kVA |
| K-Electric (Karachi) | Rs. 95,000 – 125,000 | Rs. 18,000 | 6 to 8 Weeks | 80% of Rated kVA |
| MEPCO (Multan / South Punjab) | Rs. 75,000 – 98,000 | Rs. 12,000 | 5 to 7 Weeks | 80% of Rated kVA |
| FESCO (Faisalabad Electric) | Rs. 75,000 – 95,000 | Rs. 10,000 | 4 to 6 Weeks | 80% of Rated kVA |
In-depth technical articles on unit export accounting, billing deductions, and transformer limitations.
⚡ 2026 Green Meter Budgeting at a Glance The total all-inclusive cost to secure an official 3-phase bi-directional...
✍️ SolarPakistanGuide.com Editorial Team Last Updated: July 2026 | Research Date: July 2026 | Based on NEPRA Prosumer...